Movax piling projects

Read more about some of our movax piling projects below.

  • Rother Tidal Walls East Flood Defence Scheme

    Throughout April and May 2024, the VolkerGround Engineering team were on site in Rye, East Sussex. Supporting VolkerStevin with a scheme to raise and strengthen the existing flood embankments between Scots Float and Rye Harbour, on the eastern bank of the River Rother.

    Go to project
    Rother Tidal Walls East Flood Defence Scheme
  • Thanet Parkway Station

    In March 2021, VolkerGround Engineering was awarded a contract by BAM Nuttal to support them with the construction of the new Thanet Parkway railway station, building platforms, overpass access and access roads in Cliffsend, Kent.

    Go to project
    Thanet Parkway Station
  • East West Rail structures

    In 2019 VolkerGround Engineering was awarded a contract by East West Rail (EWR) Alliance (AtkinsRéalis, Laing O’Rourke, Network Rail and VolkerRail), who have been working together to deliver the East West Rail Phase 2 project from Bicester to Bletchley.

    Go to project
    East West Rail structures
  • A585 Lodge Lane Skippool Bridge

    In Summer 2021, VolkerGround Engineering was awarded a programme of works by Kier Highways, to provide temporary steel sheet piling, Continuous Flight Auger (CFA) and rotary bored piling.

    Go to project
    A585 Lodge Lane Skippool Bridge
  • Piling: Lightbody Street

    In October 2022, VolkerGround Engineering was awarded a contract by new client Eric Wright to work with them on Lightbody Street, Liverpool, adjacent to the historic Stanley Dock Complex.

    Go to project
    Piling: Lightbody Street
  • HS2 Colne Valley Viaduct Cofferdams

    In April 2021 VolkerGround Engineering embarked on its largest project to date, the cofferdams required for the construction of the Colne Valley Viaduct, on behalf of VolkerStevin, who were working with the main works civils contractor Align, a JV comprising Bouygues, VolkerFitzpatrick and Sir Robert McAlpine.

    Go to project
    HS2 Colne Valley Viaduct Cofferdams
  • West Kirby Flood Alleviation Scheme

    In June 2022, VolkerGround Engineering commenced works on the West Kirby Flood Alleviation Scheme, for client VolkerStevin who are working on behalf of the Environment Agency and Wirral Metropolitan Borough Council.

    Go to project
    West Kirby Flood Alleviation Scheme
  • River Winster

    In August 2020, VolkerGround Engineering was awarded a contract to install 130 linear metres of permanent steel sheet piles, as part of emergency flood defence works in Grange-over-Sands, Cumbria.

    Go to project
    River Winster
  • Fairhaven to Church Scar coastal protection scheme

    In December 2017, VolkerGround Engineering was awarded a c.£1m contract by VBA, a joint venture between VolkerStevin, Boskalis Westminster and AtkinsRéalis, to install tubular and sheet piles as part of a coastal protection project along the Fylde coast.

    Go to project
    Fairhaven to Church Scar coastal protection scheme
  • Lincolnshire Lakes

    Lincolnshire Lakes is a strategic regeneration development in Scunthorpe which will include the development of 7,739 new homes and recreational facilities.

    Go to project
    Lincolnshire Lakes
  • York Depot

    In January 2019, VolkerGround Engineering was awarded a £60,000 package of works by VolkerFitzpatrick, to assist the team at the York Depot upgrade. The upgrade is required in preparation for the arrival of the TransPennine Express’ five carriage Nova 3 and Nova 1 trains.

    Go to project
    York Depot
  • Grosvenor Street

    VolkerGround Engineering was awarded a contract by Kier Construction, to provide sheet piling works as part of a redevelopment project in the heart of Mayfair, London.

    Go to project
    Grosvenor Street
  • Port of Felixstowe, Berth 9

    Between 2012 and 2015, VolkerFitzpatrick and VolkerStevin completed expansion works at the Port of Felixstowe. The VolkerFitzpatrick team delivered a new third rail terminal, to meet the Port’s growing transport demands. 

    Go to project
    Port of Felixstowe, Berth 9
  • Fairhaven Phase One

    In January 2018, VolkerStevin began works on a flood defence system at Fairhaven Beach, located in Lytham St. Annes, Lancashire. The project is being carried out by VBA, a joint venture comprising VolkerStevin, Boskalis and SNC-Lavalin’s Atkins business, with VolkerGround Engineering being awarded a £1million sub-contract to install tubular and sheet piles.

    Go to project
    Fairhaven Phase One
  • White Cart

    In a main contract worth £27.5m VolkerStevin was appointed by Glasgow City Council to construct flood defence walls through an urban section in the southern part of the city.

    Go to project
    White Cart
  • MPACT - Manchester Metro Link

    Throughout 2010 and 2011 VolkerGround Engineering was employed by MPACT, a JV between Laing O' Rourke and VolkerRail to provide a variety of geotechnical solutions to the Manchester Metrolink extension project.

    Go to project
    MPACT - Manchester Metro Link