Search

Videos

Take a look at our videos below showcasing some of our work.

  • Strategic Pipeline Alliance

    Watch here
    Aerial shot showing drilling area, and fields beyond
  • HDD - How it works

    3D-animation that shows the technique of horizontal directional drilling.

    Watch here
    How HDD works.
  • VolkerTrenchless Solutions 2023 overview

    Watch here
    VTS 2023 overview
  • Two HDDs near the Zandvliet- and Berendrechtsluis (lock) Antwerp

    Watch here
    HDD Elia Antwerpen
  • HDD - CO2-Pipe underneath river Het Scheur

    In 2018 a new tunnel will be constructed underneath the river “Het Scheur” near Rotterdam: the Blankenburgtunnel.

    Watch here
    HDD - CO2-Pipe underneath river Het Scheur.
  • HDD - Heronbridge Pipeline Duplication Scheme

    In order to maintain their supply of raw water to Sutton Hall Water Treatment Works, United Utilities (UU) required LiMA, (a Laing O'Rourke, Imtech and Atkins) AMP6 partnership to install an 800mm polyethylene (PE) pipe under the A483, which is one of the busiest roads leading in to Chester city center.

    Watch here
    HDD - Heronbridge Pipeline Duplication Scheme
  • HDD - Under the river Spree in Spreewitz (Germany)

    Two horizontal directional drillings (HDD) under the River Spree in Spreewitz (Germany) to facilitate the installation of two HDPE waste water pipes, with diameters of 1,400 mm (56”) and 1,200 mm (48”) respectively.

    Watch here
    HDD - Under the river Spree in Spreewitz (Germany)
  • HDD - Arc drilling Strijen

    PPS (Petrochemical Pipeline Services) undertook a major maintenance project on the Pipeline Rotterdam-Beek (PRB).

    Watch here
    HDD - Arc drilling Strijen
  • HDD - Arc drilling Moerkapelle

    Visser & Smit Hanab conducted a gas pipeline from Beverwijk to Wijngaarden for Gasunie NV. Therefore the Moerkapelle Ringvaart canal had to be crossed

    Watch here
    HDD - Arc drilling Moerkapelle
  • HDD - Arc drilling Moerkapelle (clip)

    Visser & Smit Hanab conducted a gas pipeline from Beverwijk to Wijngaarden for Gasunie NV. Therefore the Moerkapelle Ringvaart canal had to be crossed

    Watch here
    HDD - Arc drilling Moerkapelle (clip)
  • HDD - Districtheating Rotterdam

    Timelapse movie about the new heat pipeline between the Rotterdam harbor and the city centre.

    Watch here
    HDD - Districtheating Rotterdam
  • HDD - Districtheating Rotterdam, drilling Katendrecht

    In March 2013, Visser & Smit Hanab realised a spectacular drilling project in the densely populated city centre of Rotterdam.

    Watch here
    HDD - Districtheating Rotterdam, drilling Katendrecht
  • HDD - IJ-crossing Amsterdam

    Due to the construction of a new sewage treatment plant in Amsterdam, the present sewerage system was extended with a 49-km long pressurized sewage pipeline to transport the wastewater to the new treatment plant. 

    Watch here
    HDD - IJ-crossing Amsterdam
  • HDD - Installation gaspipeline under Westerschelde

    By means of two horizontal directional drillings of 1,350 metres and 1,450 metres, Visser & Smit Hanab installed a 48" gas pipeline under the Western Scheldt (river, which flows directly into the North Sea) for the 'Nederlandse Gasunie'.

    Watch here
    HDD - Installation gaspipeline under Westerschelde
  • HDD - Soft water for Zwijndrecht

    In order to provide Zwijndrecht and the eastern areas of Hendrik-Ido-Ambacht with soft water a new drinking water connection had to be constructed between Dordrecht and Zwijndrecht. To do so the Oude Maas river had to be crossed. 

    Watch here
    HDD - Soft water for Zwijndrecht
  • HDDW - Horizontal Directional Drilled Wells

    The HDDW technique is a unique and proven method for groundwater extraction and infiltration.

    Watch here
    HDDW - Horizontal Directional Drilled Wells

Contact us

Stay up to date with project updates? Receive our project updates in your mailbox!